It’s that time of the week again. Time to share our progress with you all on the Goddard Pre-School Project.
Photos follow the description.
Lath on exterior walls complete — all dried in. Roof too.
If it should rain, no worries, work continues inside!
Interior walls with roughed in utilities are installed simultaneously as the exterior and site work continues. Shown are insulated heating and cooling ducts ready to go into the ceiling space.